✕ CLOSE Online Special City News Entrepreneurship Environment Factcheck Everything Woman Home Front Islamic Forum Life Xtra Property Travel & Leisure Viewpoint Vox Pop Women In Business Art and Ideas Bookshelf Labour Law Letters
Click Here To Listen To Trust Radio Live

Nigerian engineers build NPDC gas facility as Baru hails feat

The Nigerian Petroleum Development Company (NPDC), an upstream subsidiary of the Nigerian National Petroleum Corporation (NNPC), has achieved a 100 per cent local content input in the development of Oredo Integrated Gas Handling Facility.

Group Managing Director of the NNPC Dr. Maikanti Baru said this on Wednesday during a tour of the NPDC’s Oredo Flow Station, Oredo Gas-to-Pan-Ocean Facility, Oredo Integrated Gas Handling Facility (IGHF), as well as the Oredo LPG Dispensing Facility, all in Edo State.

According to a statement by the corporation’s spokesman Ndu Ughamadu, Dr. Baru said he was proud that a world-class facility was being put in place by a Nigerian engineering contractor in conjunction with another Nigerian company, the NPDC.

SPONSOR AD

“From engineering, construction to erection of the various units, we feel very encouraged by the huge man-hours which you are putting in here, day and night, with full local content,” Baru told over 500 workers at the site.

The IGHF is currently at 80 per cent completion. When completed in December, it will make provision for dehydration of gas and liquid extraction. It is expected to also produce both Liquefied Petroleum Gas (LPG) and Propane, in addition to dry gas to the Escravos Lagos Pipeline System (ELPS).

He described the Oil Mining Lease (OML) 111, where the gas projects are located, as one of the most significant assets of the NPDC because it is where the corporation’s staff and their contractors design, build and operate facilities hitherto operated by the International Oil Companies (IOCs).

“You could see that right from the well-design through to reception of the various liquids to the processing and disposal of the various outputs, it is fully indigenous. So, it cannot be better than this,” he added.

Dr. Baru stated that the project’s funding constraints would be addressed soonest; stressing that NNPC was considering alternative means to support and complete the project.

Located 34km southeast of Benin City, the OML 111 is an onshore field comprising five fields viz: Oki-Oziengbe-South, Aroh North, Koko, Oghama as well as Oredo, which has 12 out of 15 wells currently producing.

Join Daily Trust WhatsApp Community For Quick Access To News and Happenings Around You.