‘TO VERIFY AND DETERMINE THE ACTUAL SUBSIDY REQUIREMENTS AND MONITOR THE IMPLEMENTATION OF THE SUBSIDY REGIME IN NIGERIA’
RESOLUTION NO. (HR.1/2012)
||| Download the full report here |||
SPONSOR AD
‘TO VERIFY AND DETERMINE THE ACTUAL SUBSIDY REQUIREMENTS AND MONITOR THE IMPLEMENTATION OF THE SUBSIDY REGIME IN NIGERIA’
RESOLUTION NO. (HR.1/2012)
||| Download the full report here |||